Inspection of Vertical Face of Bedrock Waterfall for Lake Redstone Dam Spillway

Bid/RFP Status: 
Awarded
Bid/RFP Due Date: 
Tuesday, May 17, 2016 - 12:00am
Back to Bids/RFPs

 

REQUEST FOR PROPOSAL

Sauk County Parks

 

Inspection of Vertical Face of Bedrock Waterfall for Lake Redstone Dam Spillway

Thursday, May 05, 2016

 

I.          Point of Contact:        Matt Stieve, Parks Director

                                                Sauk County Parks

                                                S7995 White Mound Drive

                                                Hillpoint, WI  53937

                                                Phone:  608-355-4800

                                                mstieve@co.sauk.wi.us

                                               

            2nd Point of Contact:   (Questions Regarding Scope of Project)

                                                Tanya Lourigan, P.E., Water Management Engineer

                                                Wisconsin Department of Natural Resources

                                                3911 Fish Hatchery Road

                                                Fitchburg, WI  53711

                                                Phone: (608) 275-3287

                                                Tanya.Lourigan@wisconsin.gov

 

II.        Proposal Due Date:     Two sealed copies of the proposal must be received and date stamped no later than 12:00 noon, Central Standard Time, Tuesday, May 17, 2016.  Faxes are not acceptable.  Proposals or amendments received by Sauk County after that time will not be considered. 

 

III.       ALL PROPOSALS MUST BE ADDRESSED TO:

                                                Sauk County Clerk

                                                West Square Building

                                                505 Broadway

                                                Baraboo, WI  53913

                                                                       

The words “Inspection of Vertical Face Bedrock, Lake Redstone Dam Spillway." must be marked on the opaque, sealed envelope.